Monday, 1 March 2010

Olympic Endeavour


Pattern: Deep in the Forest Mittens
Needle size: 2.5mm bamboo DPN's
Yarn: Sundara Sock in Beaded Turquoise and Cactus Flower

I cast on for this, my Knitting Olympic project on day 4 of the winter games in Vancouver. It took me a while to get into the swing of knitting with 2 colours, making sure that the yarn carried on the back was loose enough to keep the knitting flat but not too loose. The first mitten knit up slowly, it took from day 4 to day 15 to complete. This left me with 2 1/2 days to complete mitten 2. By now handling 2 colours was almost second nature and having met all of the different elements of the mitten already I could just crack on with the knitting, no stops for pattern interpretation required. I took the mittens to work and knit on all my breaks, even a couple of rows gained here could make all the difference. I stayed up late watching the Olympic coverage and knit, I got up early and knit before work. On Sunday I sat down in front of the fire and knit, and knit, and knit. I knit through the highlights of day 16, I knit through the Men's 50K Cross Country Ski, I knit through the Ice Hockey final. My fingers flew and by the time we reached the closing ceremony I was knitting my way up the thumb. And on through the closing ceremony I worked grafting the thumb, weaving ends sewing the seam on the cuff hem. By some miracle I had finished just as the speeches drew to a close. And so I sat in my new mittens and watched as the Olympic flame was extinguished. Somehow I had finished. Mitten 1 took 11 1/2 days to knit and somehow I had pulled off a miracle and knit mitten 2 in 2 1/2 days. Truly an Olympic endeavour!


For mitten 1 I followed the pattern for the braided cuff. This resulted in a braid pointing the opposite way to the image on the pattern. So for mitten 2 I reversed the pattern and ended up with mirror image braids, a small detail but 1 that pleases me no end.

This is the first pattern that I have knit with a cuff seam, and it was much easier than I expected. I have seen this mitten knit with a picot here rather than just a plain edge and I think I may try that if I knit something similar in the future.

All in all I'm pretty pleased with these mittens. This pattern was easy to follow, and apart from a discrepancy between the written instructions and chart over the starting point for the thumb gusset and the braid coming out reversed if knit as written, there were no problems. I think I may have got my tension sorted out quicker if I had knit a pattern like Eunny Jang's Endpaper Mitts where you aren't having to carry yarn over such large areas and where the pattern is regular and easy to memorise allowing you to keep a closer eye on the knitting with out constantly referring to the chart. Having said that I'm glad I chose the pattern I did and am very happy with end results. Now I have 4 years to pick out a project for next time.

Saturday, 27 February 2010

... by little

Progress is speeding up on the Deep in the Forest Mittens.


Day 15 saw mitten 1 complete and mitten 2 cast on and already at row 32 of the chart, half way through the thumb increases. With 2 days left it looks as though I may just squeak this one under the wire.

Monday, 22 February 2010

Little by Little


Progress is being made on the Deep in the Forest Mittens. Slow progress, but progress none the less. I'm 15 rows into the trees chart and not finding managing two colours that hard. I am fighting with carrying the strands on the back, I keep trying to pull them too tight and have to force myself to leave them loose. I just need to stop going out for lunch and progress might speed up.


Thursday, 18 February 2010

Optimistic Olympian

Once again the Olympics are upon us. This time as the athletes gather in Vancouver I'm optimistic that I shall reach the podium. Not for me this year the hurly burly and excitement of the Ravelympics, for that way madness lies [ Beijing 2008. Projects chosen - 4. Other commitments - move house, start a new job. Projects completed - 1 (in December 2009) ]

This year I decided I would throw my hat in with the YarnHarlot. Her vision of The Knitting Olympics is of personal challenge, no teams, no events, no statistics. The idea was very simple
1. Pick a project that will challenge you as a knitter
2. When the torch is lit start knitting
3. Finish by the time the games end.
Simple. Just you, the yarn and 17 days. If you finish you win (and get a button for your blog) if you don't, well hopefully you've had fun and maybe learned something new (like don't bite off more than you can chew! Although that wouldn't be any thing new for me)

And so I picked my project and waited. For a while it looked like YarnHarlot wasn't in for the fun this time around, but that was ok this was a personal challenge after all.

Then the post came, and the game, well Games, were on. I had a prowl through the comments to see what other people were planning and came across these mittens. I had some yarn in my stash that would be perfect and so I switched projects.

And here we are day 6. It's snowing outside, the fire is going and I can't think of anywhere better to be than here finally learning to knit stranded colour work. With only 11 days left I do need to crack on if I hope to finish but with work quieter and my guests all gone I'm feeling quietly optimistic about the whole thing. It's just a shame my TV won't play any BBC channels so I can't watch events unfolding in Vancouver.


Saturday, 23 January 2010

The Knitter's Progress


Progress has been made around here lately. This scarf has been finished and blocked. It's just waiting for some ends to be woven in.


I have made three pairs of these mittens since I found the pattern before Christmas. There are still a couple more pairs to go as I don't have a pair yet.
And finally progress is also being made on a scarf for my brother. I'm onto the third ball of this eight ball beast. It will need a good block when it's finished to open up the cables a bit and give it some much needed extra width.

Friday, 1 January 2010

Merry Christmas and a Happy New Year

I've had a lovely Christmas this year. My current job is a hop, skip and a short ferry ride away from the Isle of Wight and some of my family. This was all the excuse that was needed to have a full on family Christmas, even Grumps made the trip down to join us. There was lots of yummy food, walks by the sea, excited toddlers charging about, old men snoozing in front of the fire, scrabble games and glasses of single malt. Perfect. I was spoilt with some great gifts from people who obviously know me very well! PJs, slippers, perfume, a jigsaw, a cook book and some knitting things. Knitted Lace of Estonia came from Bee and these fabby blocking wires were from my little brother.

Now I'm not really one for making New Years resolutions. They're like diets, the moment you say you can't have something that's all you want. Having said that I do have an aim for the year. To use my stash. I have a good stash of yarn that will allow me to knit a variety of projects through the year. I have enough for a few childrens jumpers, a couple of lace shawls, some socks and even an aran jumper for Grumps. I also have a large stash of fabric and a stack of books that I've not got around to reading yet. So the plan is to find interesting projects that will use up the stash. I'm going to keep a wish list of any yummy yarns or fabric that I spot during the year, then I'll have something to ask Santa for next year! At the moment I'm working on getting all of my yarn stash photographed and up on Ravelry so that I can see how well the stash busting is going. I have also been working on finishing projects that have been hanging around in my knitting basket for a while. A few things are finished, just needing a block and photos taking and then they'll be ready to share.

Saturday, 12 December 2009

Tweedy Pi


Pattern: Pi Blanket from Knitter's Almanac by Elizabeth Zimmerman
Needle size: 5mm
Yarn: Rowanspun DK



This shawl was lovely and simple, mostly just plain knitting. You start at the middle and knit, then you increase, knit some more, increase again, and each time the knitting takes longer before you reach the next set of increases. This made it an ideal project to knit at work. I followed the plain pattern throwing in a YO K2tog round when I hit the knit 96 rounds section to break things up a bit. As I had 5 balls of yarn for this project I decided that when I reached half way through my 4th ball I would prepare for casting off. I knit a YO K2tog round followed by 2 plain knit rounds 3 times. Then I did the knitted cast off that EZ recommends. The 3 rounds of YO K2tog's gave me a bit of interest at the edge as the cast off is plain garter stitch. I love this pattern and think that I will be knitting another Pi in the future, with some patterning this time. The yarn was good to work with and I think the tweedy flecks give a bit of interest to what otherwise would have been a bit of a plain knit. Unfortunately this yarn was gifted to me a few years ago and has now been discontinued.


I cast on for this on a set of 5mm bamboo DPN's. Once the first couple of increase rounds were out of the way I moved onto an Addi premium circular needle. I've seen these recommended on various blogs and decided to treat myself as I knew this project would be on the needles for a while. I have to say that they didn't disappoint. The joins between tip and cable were nice and smooth so I wasn't having to ease hundreds of stitches over snaggy joins. The tips were also comfortable to hold and sharp enough to make knitting easy (but not so sharp that I was accidentally splitting stitches all over the place).
All in all this was a good project and is currently in use keeping my knees warm in a draughty prompt corner.